BOOKING 2027–2028 CAPACITY BLOCKS NORTH AMERICA & GULF

Behind-the-Meter Power & Liquid Cooling for AI Infrastructure.

Stop waiting five years for utility interconnects. Exawatt builds, owns, and operates modular solid oxide fuel cell and thermal storage stations beside your data center—bringing 24/7 firm power and direct-to-chip cooling under one SLA.

Model Your Site Savings
Modular Block Scaling
50–500 MW
Contracted Uptime SLA Target
99.999%
Cooling Power Overhead Target
−45%
Municipal Water Draw Target
Zero

01 / Integrated Stack

Three Systems. One Turnkey Utility.

Exawatt combines on-site generation, thermal buffering, and chip-level heat rejection to reduce dependence on the grid and eliminate the need for evaporative cooling.

01 // GENERATION

Factory-Sealed Micro-Cores

Skid-mounted 50–100 MW reactor modules are designed to deliver firm, zero-carbon baseload power behind the meter with multi-year refueling intervals.

Bridge option: gas-to-nuclear transition

02 // BUFFERING

Molten-Salt Thermal Vaults

High-density thermal storage buffers rapid GPU training load spikes to help keep compute running without stressing turbines.

Load-following response target: < 15 ms

03 // DISSIPATION

Closed-Loop Cryo-Manifolds

Dielectric and glycol loops carry heat away from server racks and recover it for reuse without evaporating municipal water.

PUE target: 1.06 in desert and temperate zones

02 / Site Simulator

Calculate Your Cluster Deployment

Set your target IT load to estimate the number of power modules, facility overhead, and water savings versus evaporative cooling.

EXAWATT MODULES
2 unitsBased on 50 MW of IT load per module
ANNUAL WATER SAVED
876M LCompared with evaporative cooling
FACILITY OVERHEAD
6 MWPower above IT load at a 1.06 PUE target
TIME TO ENERGIZATION
Site-specificAssessed during the feasibility review

Illustrative estimates assume continuous IT load and an evaporative cooling baseline of 1 L per IT kWh. Module counts exclude redundancy and facility overhead.

03 / Deployment

From Site Plan to Firm Power.

Start with your site, target IT load, and commissioning window. We use those inputs to assess the right capacity and deployment sequence for your cluster.

  1. Scope the site

    Review location, target megawatts, and the data center’s cooling requirements.

  2. Plan the power and cooling

    Evaluate the module mix, site constraints, and whether bridge power makes sense.

  3. Define the delivery plan

    Set milestones for approvals, commissioning, and the capacity and cooling SLA.

2027–2028 Capacity Intake

Planning your next AI campus?

Capacity and timing are subject to site feasibility, permitting, regulatory approvals, and commercial agreement.

2027–2028 Capacity Intake

Reserve Site Capacity

Tell us about your planned AI deployment. This inquiry starts a feasibility review and does not secure capacity.