01 // GENERATION
Factory-Sealed Micro-Cores
Skid-mounted 50–100 MW reactor modules are designed to deliver firm, zero-carbon baseload power behind the meter with multi-year refueling intervals.
BOOKING 2027–2028 CAPACITY BLOCKS NORTH AMERICA & GULF
Stop waiting five years for utility interconnects. Exawatt builds, owns, and operates modular solid oxide fuel cell and thermal storage stations beside your data center—bringing 24/7 firm power and direct-to-chip cooling under one SLA.
01 / Integrated Stack
Exawatt combines on-site generation, thermal buffering, and chip-level heat rejection to reduce dependence on the grid and eliminate the need for evaporative cooling.
01 // GENERATION
Skid-mounted 50–100 MW reactor modules are designed to deliver firm, zero-carbon baseload power behind the meter with multi-year refueling intervals.
02 // BUFFERING
High-density thermal storage buffers rapid GPU training load spikes to help keep compute running without stressing turbines.
03 // DISSIPATION
Dielectric and glycol loops carry heat away from server racks and recover it for reuse without evaporating municipal water.
02 / Site Simulator
Set your target IT load to estimate the number of power modules, facility overhead, and water savings versus evaporative cooling.
Illustrative estimates assume continuous IT load and an evaporative cooling baseline of 1 L per IT kWh. Module counts exclude redundancy and facility overhead.
03 / Deployment
Start with your site, target IT load, and commissioning window. We use those inputs to assess the right capacity and deployment sequence for your cluster.
Review location, target megawatts, and the data center’s cooling requirements.
Evaluate the module mix, site constraints, and whether bridge power makes sense.
Set milestones for approvals, commissioning, and the capacity and cooling SLA.
Capacity and timing are subject to site feasibility, permitting, regulatory approvals, and commercial agreement.